Knight Architects completed a planning charrette that set the basic parameters for the future 4UA barracks complex in November of 2003 (see aerial perspective sketch at lower left). The 4th UA complex will be an offspring of a Stryker Brigade Combat Team currently located elsewhere. Knight Architects then completed the 100% design for the Barracks, the Brigade HQ and completed SID and CID for all five building types. The project will be completed in three phases and includes three 258 PN barracks, a dining facility, the 4th UA HQ building, three battalion based COF buildings and three BN HQ buildings. The design of the complex relates closely to Mr. Knight’s concept design for the 1st Brigade Complex Master Plan which served as the basis for project design on that $115M complex.